
Dan Kimball and Paul Wainwright with the dock sections ready for installation.

Dan Kimball, Paul Wainwright, and Tim Dziechowski inspect the hardware and dock sections.

Tim Dziechowski prepares the old launch ramp.

Dan Kimball,, Tim Dziechowski, and Pete McVay prepare the old launch ramp and stairs for the dock installation.

Two days later, the dock is in the water!